Well work is slowly continuing on the Vault building project. I'm putting the finishing touches on the 3rd level tomorrow and then it's on to the entrance and right tower's two remaining levels. Naturally there are a ton of holes and small things to tackle, but I'm keeping most of that minor stuff of till the entire structure is done:
And a quick detail shot of the entrance into the second tower:
Next update should be online in two to three days!